WhatsApp

Infrastructure Projects
in Colombia

Real projects under demanding conditions. Each one proves that certifications, team, and commitment operate as one.

Every project,
a trial by fire

Real projects, in real conditions. That's how we build client trust.

0
environmental sanctions across the projects listed here
35+
professionals on the operations team
15
vehicles in our own fleet
700+
portable toilets in nationwide operation
Hidroituango — Interior del túnel de desviación
Energy · Antioquia

Hidroituango

Challenge

Ensure environmental sanitation and waste management inside the tunnel complex of Colombia's largest hydroelectric plant, at work sites with no access to basic infrastructure.

Approach

Our own 24/7 operation inside the diversion tunnel, with dedicated personnel and equipment on-site for more than 5 years under a continuous contract with EPM.

Result

Zero environmental sanctions throughout the life of the contract.

5+
years contracted
24/7
availability
EPM
client
Túnel Guillermo Gaviria Echeverri
Infrastructure · Antioquia

Guillermo Gaviria
Echeverri Tunnel

Challenge

Sustain the environmental sanitation of one of the country's most important road infrastructure projects, through years of continuous excavation and construction.

Approach

Our own personnel permanently on-site and our own equipment, with six years of uninterrupted operation on the project.

Result

Zero environmental sanctions throughout the life of the contract — we left our mark there too.

24/7
availability
Road
sector
6
years
Puerto Antioquia — Operaciones con Licencia DIMAR
Port · Urabá

Puerto Antioquia

Challenge

Ensure environmental sanitation from the construction of the deep-water terminal on Colombia's Pacific-Caribbean coast, and sustain that operation once the port became active.

Approach

Present as allies from the start of construction; today, with the port operating, we continue in portable sanitation, port and naval operations, under an active DIMAR License.

Result

From construction partner to permanent operator — that's where we left our mark.

DIMAR
active license
Aliado
since construction
Urabá
Golfo
Metro de Bogotá — Línea 1, saneamiento portátil en obra
Infraestructura · Bogotá

Metro de Bogotá
— Línea 1

Challenge

Sustain portable sanitation at the work sites of one of Colombia's largest infrastructure projects, with coverage outside our home region.

Approach

Nationwide operational deployment, bringing the same service standard we apply in Antioquia to the country's capital.

Result

An Antioquian company operating at one of Colombia's largest and most visible projects, contributing to the development of the capital and the country.

Bogotá
Línea 1
Nacional
cobertura
¿Trabaja en un proyecto similar?

Cuéntenos su requerimiento

Tenemos la experiencia, las certificaciones y el equipo para garantizar el cumplimiento ambiental en cualquier sector. Le enviamos una propuesta en menos de 48 horas.

Hablar con un experto Ver todos los servicios